Loading...

EN

お知らせ

お知らせ

旅行会社の方へ

  • Notice of Completion of Renovation Work

    2024/04/10

    Dear valued customer,

     

    Thank you for your steadfast loyalty and patronage.

     

    We are pleased to inform guests that the major renovation work we have been conducting since last September was completed on March 27, 2024.

    The details of the renovations carried out during this construction are as follows.

     

    (1) Hotel exterior wall repair and painting

    We had not painted some decorations, so we painted the entire facility during this work.

    Architect Ms. Yuko Nagayama designed the exterior of our hotel during the rebranding opening in 2016.

    However, some of the work still needed to be done, which was completed during this work.

     

    (2) Installation of individual air conditioning in all guest rooms

    Before this renovation, we used central air conditioning, but we have now installed air conditioning units in all guest rooms.

    All guests can adjust the temperature in their rooms by themselves, making them comfortable even in spring and fall.

     

    (3) Renewal work on the public baths

    The men’s and women’s public baths have been completely renewed.

    Powder space has been installed in the women’s public bath for more comfortable use.

    In addition, locks have been installed in the women’s public baths for security, so guests can use safety them.

     

  • 団体昼食・バスストップランチのご案内 2023.7.1よりメニューをリニューアル致します

    2021/05/10

    旅行会社の方、団体・グループ旅行をご検討の方へ

     

    松本城から徒歩5分程度の当館でお昼ご飯のご利用はいかがでしょうか?

    メインダイニング〔レストランI;caza〕や宴会場でご利用いただける団体昼食プランのご紹介をいたします。

     

    2023年7月1日より内容をリニューアルいたします。

    詳細は団体昼食フライヤーよりご確認をお願いいたします。

@ Matsumoto Hotel Kagetsu